We give the best Services
There has been a continuous effort to provide customers with the most efficient, effective and safest full-service steel construction. Furthermore, by utilizing the abilities and knowledge of our existing employees, MT Infrastructure can successfully perform any size project and provide clients with premier construction resources. No matter the size, complexity or location of your project, we can provide you with personalized service, reliability, and construction quality you deserve. Our erection team comprises of highly qualified, trained, and professionals who have carried out a large variety of projects for various companies in the region. The erection team is well monitored by our engineering, plant and the projects management to execute the planned erection as per the schedule. Our goal is to provide a safe, efficient, quality service to all our customers across the structural steelwork industry. Prior to the start of erection activities at site, a specific erection plan and method statement is developed during one or more pre-construction conferences and site inspections involving MT Infrastructures , the controlling contractor, and others such as the project engineer and consultant. In this process, the following elements are considered: The sequence of erection activity: Material deliveries, Material staging and storage and Coordination with other trades and construction activities. Description of the cranes, equipment’s used and placement procedures: Site preparation, Path for overhead loads and Critical lifts, including rigging supplies and equipment. Description of steel erection activities and procedures :Stability considerations requiring temporary bracing, Erection bridging terminus point, Notifications regarding repair/ replacement and modifications of anchor bolts, Columns and beams (including joists and purlins), Connections, Decking and other miscellaneous steel work. Description of the fall protection procedures. Health and Safety plan procedure. Description of the special procedures required for hazardous non-routine tasks. Certification for each employee who has received training for performing steel erection work. List of the qualified and competent persons. Description of the procedures that will be utilized in the event of rescue or emergency response. Disposable of waste material. Roofing and siding panels are normally kept in a slightly sloped position for drainage, Cold-formed girts and purlins may be stored flat, to eliminate hard points at the supports. Proper palettes keeps the metal members off the ground rather than allowing them to sink into the mud. Rolls of fiberglass insulation are best kept off the ground and covered.
Our Services
Contact Us
- H.O.- 23 The Royal Avenue, Tonk Road, Sitabari, Jaipur (Raj.) 302029Pennsylvania 19132
- +91-9680786460
- mtinfrastructures@gmail.com